Luxury kitchen remodel with dark cabinetry and stone countertops

Kitchen Remodeling

Full kitchen renovations coordinated by one contractor — demo, mechanicals, cabinetry, tile, and finish carpentry under a single written scope.

Overview

Kitchen Remodeling in FL, GA, AL, TN, NC & SC

The kitchen is the most complex room in the house to renovate. It stacks plumbing, electrical, lighting, waterproofing, tile, and cabinetry into one footprint, and every trade has to land in the right order. When those handoffs are managed by different companies, the schedule slips and the details get lost.

STRUXA runs the whole sequence in-house. We demo, rough in the mechanicals, inspect, close the walls, set cabinets and countertops, and finish — with one point of contact from the first walkthrough to the punch list.

You get an itemized written estimate before anything is torn out, so you know exactly what each line of the project costs and what is not included.

What’s Included

Scope You Can Hold Us To

  • Demolition, debris removal, and site protection
  • Cabinet layout, ordering, and installation
  • Countertop templating, fabrication, and set
  • Plumbing relocation, fixture and valve installation
  • Electrical circuits, lighting, and code-required GFCI protection
  • Tile, backsplash, and stone installation
  • Finish carpentry, trim, and paint
  • Permits, inspections, and final cleanup

How It Works

Four Steps, Kitchen Remodeling

  1. 01

    Consultation

    We measure the space, review finishes and layout options, and identify plumbing or structural constraints.

  2. 02

    Estimate

    A written, itemized scope with allowances for cabinetry, tile, and fixtures — line by line.

  3. 03

    Build

    Demo, rough-in, inspection, close-in, and finishes on a posted schedule.

  4. 04

    Walkthrough

    We test every fixture together and correct the punch list before final payment.

Questions

Kitchen Remodeling FAQ

Something not covered here? Call (407) 444-1653 and ask directly — we answer scope questions before you commit to anything.

A typical full kitchen remodel runs six to ten weeks from demo to final walkthrough. Cabinet lead times drive the schedule more than the labor does, so we order early and start demolition once materials are confirmed.

Ready to Build?

Tell us about your kitchen remodeling project and get a written, itemized estimate — no obligation.

Serving FL, GA, AL, TN, NC & SC