
Flooring
Tile, luxury vinyl plank, and hardwood installed over a properly prepared substrate — the part most installers skip.
Overview
Flooring in Orlando & Central Florida
Almost every flooring failure traces back to the subfloor. Slabs that are out of level telegraph through plank, moisture in concrete lifts adhesive, and unaddressed movement cracks tile grout within a season.
STRUXA prepares the substrate before a single box is opened: moisture testing on slab, leveling compound where required, and correct underlayment for the product being installed.
We install throughout Orlando and Central Florida on both occupied homes and commercial spaces, and we sequence the work so rooms come back into service in the order you need them.
What’s Included
Scope You Can Hold Us To
- Removal and disposal of existing flooring
- Slab moisture testing and mitigation
- Floor leveling and substrate preparation
- Underlayment and vapor barrier installation
- Tile, LVP, laminate, and hardwood installation
- Waterproofing in wet areas
- Transitions, thresholds, and stair nosing
- Baseboard removal, reinstallation, or replacement
- Grout, sealing, and final cleaning
How It Works
Four Steps, Flooring
- 01
Measure
We measure, check slab flatness and moisture, and confirm material quantities with waste factor.
- 02
Estimate
Written pricing separating material, prep, and installation so nothing is buried in a lump sum.
- 03
Install
Tear-out, prep, layout, and installation room by room, with dust control and daily cleanup.
- 04
Walkthrough
We inspect the layout, transitions, and grout lines with you before the job closes out.
Questions
Flooring FAQ
Something not covered here? Call (407) 444-1653 and ask directly — we answer scope questions before you commit to anything.
We can move standard furniture as part of the scope. Pianos, safes, aquariums, and wall-mounted electronics are excluded and should be handled by a specialist before we start.
Yes, for most homes. LVP handles Central Florida humidity better than laminate and installs over concrete slab without acclimation issues, provided the slab is level and moisture-tested first.
LVP and hardwood are walkable immediately. Tile needs roughly 24 hours after setting and another 24 to 72 hours after grouting before heavy furniture returns.
Sometimes, but we rarely recommend it. Overlaying raises floor height at doors and transitions and hides substrate problems. We evaluate and tell you plainly which approach is worth the money.
Yes. We remove and reinstall existing baseboard, or supply and install new trim with caulk and paint touch-up as a separate line item on the estimate.
Ready to Build?
Tell us about your flooring project and get a written, itemized estimate — no obligation.
