Modern bathroom remodel with freestanding tub, glass shower and gold fixtures

Bathroom Remodeling

Full bathroom renovations — waterproofing, tile, fixtures, and finishes — managed by one contractor from demo to final walkthrough.

Overview

Bathroom Remodeling in FL, GA, AL, TN, NC & SC

Bathrooms are high-risk renovation spaces. Moisture, plumbing, and electrical all intersect behind the walls, and a skipped waterproofing detail can turn into thousands in damage within a year. The work has to be sequenced correctly and inspected at the right moments.

STRUXA manages the full bathroom renovation path: demo, rough plumbing and electrical, shower pan and wet-wall waterproofing, tile, fixture set, and finish carpentry. One point of contact means nothing falls between trades.

You get an itemized written estimate before demolition starts, with clear allowances for tile, fixtures, and finishes so there are no surprises halfway through the project.

What’s Included

Scope You Can Hold Us To

  • Demolition, debris removal, and site protection
  • Plumbing relocation, fixture and valve installation
  • Electrical circuits, lighting, exhaust fans, and GFCI protection
  • Shower pan and wet-wall waterproofing
  • Tile, backsplash, and stone installation
  • Vanity, mirror, and accessory installation
  • Finish carpentry, trim, and paint
  • Permits, inspections, and final cleanup

How It Works

Four Steps, Bathroom Remodeling

  1. 01

    Consultation

    We measure the space, review layout and finish options, and identify plumbing or structural constraints.

  2. 02

    Estimate

    A written, itemized scope with allowances for tile, fixtures, and waterproofing — line by line.

  3. 03

    Build

    Demo, rough-in, waterproofing, tile, fixture set, and finishes on a posted schedule.

  4. 04

    Walkthrough

    We test every fixture and check the waterproofing details together before final payment.

Questions

Bathroom Remodeling FAQ

Something not covered here? Call (407) 444-1653 and ask directly — we answer scope questions before you commit to anything.

A typical full bathroom remodel runs four to six weeks from demo to final walkthrough. Tile work and fixture lead times drive the schedule, so we confirm materials before starting demolition.

Ready to Build?

Tell us about your bathroom remodeling project and get a written, itemized estimate — no obligation.

Serving FL, GA, AL, TN, NC & SC